2022-11-30 Arista 7280SR-48C6 switch at KOMO Plaza retired.
2022-10-11 One Arista 48-port 1/10G SFP+, 2-port 100G QSFP28 line card (7500R-48S2CQ) removed from, and one 36-port 100G QSFP28 line card (7500R-36CQ) installed into the Arista 7512R. Arista 7512R switch capacity now 288x 1/10G SFP+ and 192x 100G QSFP28.
2022-10-11 Two Arista 48-port 10G line cards (7500E-48S) removed from, and one 36-port 100G QSFP28 line card (7500R2-36CQ) installed into the Arista 7508R. Arista 7508R switch capacity now 192x 1/10G SFP+ and 108x 100G QSFP28.
2022-04-06

Arista 7504R3 with two 4-port 400G QSFP-DD, 48-port 1/10/25G SFP line cards (7500R3K-48Y4D), two 36-port 100G QSFP28 line cards (7500R3-36CQ), and two supervisors (DCS-7500-SUP2) powered on at KOMO Plaza.

2022-03-16

Arista 7808R3 with two 36-port 400G QSFP-DD line cards (7800R3-36D) and two supervisors (DCS-7800-SUP1A) powered on at the Westin Building.

2020-11-25

One Arista 48-port 1/10G SFP+, 2-port 100G QSFP28 line card (7500R-48S2CQ) installed into the Arista 7512R. Arista 7512R switch capacity now 336x 1/10G SFP+ and 158x 100G QSFP28.

2019-03-14

One Arista 36-port 100G QSFP28 line card (7500R-36CQ) installed into the Arista 7512R. Arista 7512R switch capacity now 288x 1/10G SFP+ and 156x 100G QSFP28.

2019-02-12

One Arista 36-port 100G QSFP28 line card (7500R-36CQ) installed into the Arista 7512R. Arista 7512R switch capacity now 288x 1/10G SFP+ and 120x 100G QSFP28.

2018-10-26

Arista 7508 switch supervisors and fabric modules upgraded from 7500E to 7500R Series. Two Arista 12-port 100G QSFP28 line cards (7500E-12CQ) replaced by two Arista 36-port 100G QSFP28 line cards (7500R-36CQ). Arista 7508R switch capacity now 288x 10G SFP+ and 72x 100G QSFP28.

2018-03-21 Cisco Nexus 3524P switch at Sabey Intergate retired.
2018-03-09

Arista 7280SR-48C6 switch at Sabey Intergate activated with 300 Gbps ISL to core Arista 7512R. (photo)

2017-11-30

Two Arista 36-port 100G QSFP28 line cards (7500R-36CQ) removed from the Arista 7512R. Arista 7512R switch capacity now 288x 1/10G SFP+ and 84x 100G QSFP28.

2017-08-22

Extreme X670 at KOMO Plaza retired. KOMO Plaza Arista 7280SR-48C6 ISL to core Arista 7512R increased from 200 to 300 Gbps. (photo)

2017-08-18 Arista 7280SR-48C6 switch at KOMO Plaza activated with 200 Gbps ISL to core Arista 7512R.
2017-07-18

One Arista 36-port 100G QSFP28 line card (7500R-36CQ) and two 48-port 1/10G SFP+, 2-port 100G QSFP28 line cards (7500R-48S2CQ) installed into the Arista 7512R. Arista 7512R switch capacity now 288x 1/10G SFP+ and 156x 100G QSFP28.

2017-01-12

Temporary Arista 7050SX-128 retired.

2016-12-14

Arista 7512R now consists of 2 supervisors (DCS-7500-SUP2), four 48-port 1/10G SFP+, 2-port 100G QSFP28 line cards (7500R-48S2CQ), and three 36-port 100G QSFP28 line cards (7500R-36CQ). Arista 7512R switch capacity now 192x 1/10G SFP+ and 116x 100G QSFP28. (photo)

2016-10-27

Arista 7512R with one 36-port 100G line card (7500R-36CQ) powered on at the Westin Building.

2016-10-21

Cisco 6509 retired.

2016-10-14 Temporary Arista 7050SX-128 installed.
2015-10-06

Second Arista 12-port 100G QSFP28 line card (7500E-12CQ) installed into the Arista 7508E. Arista 7508E switch capacity now 288x 10G SFP+ and 24x 100G QSFP28. (photo) (photo)

2015-06-11

Arista 12-port 100G QSFP28 line card (7500E-12CQ) installed into the Arista 7508E, replacing temporary 6-port CFP2 line card. Spare 48-port 10G (7500E-48S) also removed. Arista 7508E switch capacity now 288x 10G SFP+ and 12x 100G QSFP28.

2015-04-27 Huawei CE12808 switch decommissioned.
2015-03-11

Temporary Arista 6-port 100G CFP2 line card (7500E-6C2) installed into the Arista 7508E. Arista 7508E switch capacity now 336x 10G SFP+ and 6x 100G CFP2. (photo)

2015-01-29

Second Arista 48-port 10G & 2 MXP line card (7500E-72S) installed into the Arista 7508E. Arista 7508E<>Huawei ISL increased to 480 Gbps. Arista 7508E switch capacity now 336x 10G SFP+.

2014-11-20

Cisco Nexus 3524P switch at Sabey Intergate activated with 20 Gbps ISL to core Arista 7508E. (photo)

2014-11-07

Arista 7508E<>Huawei ISL increased to 240 Gbps. (photo) (photo) (photo)

2014-11-06

Arista 7508 switch supervisors, line cards and fabric modules upgraded from 7500 to 7500E Series. (photo)

2014-09-04

Arista 48-port 10G & 2 MXP line card (7500E-72S) installed into the Arista 7508. Arista 7508 switch capacity now 288x 10G SFP+.

2014-08-25

Huawei 4-port 100G CFP line card (CE-L04CF-EF) installed. (photo) (photo) (photo) (photo) (photo) (photo)

2014-06-20

Huawei CE12808 switch with 2 Supervisors, a 24-port 40G QSFP10 (CE-L24LQ-EA), and two 48-port 10G (CE-L48XS-EA) line cards installed for beta testing. (photo)

2014-03-27

Fifth Arista 48-port 10G line card (7548S) installed into the Arista 7508. Arista 7508 switch capacity now 240x 10G SFP+. (photo)

2013-06-06

Fourth Arista 48-port 10G line card (7548S) installed into the Arista 7508. Arista 7508 switch capacity now 192x 10G SFP+.

2012-11-13

Third Arista 48-port 10G line card (7548S) installed into the Arista 7508. Arista 7508 switch capacity now 144x 10G SFP+. (photo)

2012-08-08

KOMO Plaza (Fisher) switch upgraded from Cisco 4912G to Extreme X670 and ISL increased from 1 Gbps to 10 Gbps.

2011-09-09

Cisco Nexus 5020 retired.

2011-08-23

Arista 7508 with two 48-port 10G SFP+ line cards (7548S) began connecting members. (photo) (photo)

2009-07-08

Cisco Nexus 5020 with 52 10G ports began connecting members. (photo)

2009-02-12

Third Cisco 48-port GigE SFP line card (WS-X6748-SFP) installed into the Cisco 6509. Cisco 6509 switch capacity now 144x GigE SFP and 16x 10G XENPAK.

2008-12-11

Fourth Cisco 4-port 10G line card (WS-X6704-10GE) installed and 48-port GigE RJ45 line card (WS-X6748-GE-TX) removed from the Cisco 6509. Cisco 6509 switch capacity now 96x GigE SFP and 16x 10G XENPAK.

2008-03-27

A redundant Cisco Supervisor Engine (WS-SUP720-3BXL) and third Cisco 4-port 10G line card (WS-X6704-10GE) installed into the Cisco 6509. Cisco 6509 switch capacity now 96x GigE SFP, 48x GigE RJ45 and 12x 10G XENPAK.

2007-08-09

Second Cisco 48-port GigE SFP line card (WS-X6748-SFP) installed into the Cisco 6509. Cisco 6509 switch capacity now 96x GigE SFP, 48x GigE RJ45, and 8x 10G XENPAK. Additional Cisco 4912G and Cisco 3508 retired.

2007-06-27

Cisco 4912G and two Cisco 3508's retired.

2007-06-15

Second Cisco 4-port 10G line card (WS-X6704-10GE) installed into the Cisco 6509. Cisco 6509 switch capacity now 48x GigE SFP, 48x GigE RJ45, and 8x 10G XENPAK.

2007-05-02

Cisco 6509 installed with Supervisor Engine (WS-SUP720-3BXL), 4-port 10G line card (WS-X6704-10GE), 48-port GigE SFP line card (WS-X6748-SFP), and 48-port GigE RJ45 line card (WS-X6748-GE-TX).  Cisco 6504E, Cisco 4003, and Intel Express 100FX retired.