Date: Mon, 14 May 2007 17:58:15 -0700 From: Ed Seiler Subject: SIX Extension Switch Proposal: Fibercloud Extension Switch Proposal: Fibercloud would like to connect a dedicated public extension switch from our 19th floor data center to the SIX. The switch would be connect via MM fiber in a similar manner as out 18th and 32nd floor data center public switches and according to the policy specified the SIX rules from http://www.seattleix.net/rules.htm. Fibercloud will use a Cisco 3524-XL switch running the current/latest IOS: >>>>>IOS (tm) C3500XL Software (C3500XL-C3H2S-M), Version 12.0(5)WC17, >>>>>>>>>>RELEASE SOFTWARE (fc1) Copyright (c) 1986-2007 by cisco Systems, Inc. >>>>>Compiled Tue 13-Feb-07 15:04 by antonino All SIX customer access ports will be configured with: port security port security max-mac-count 1 port security action shutdown Global configuration includes: spanning-tree portfast bpduguard The above configuration will require manual clearing of a port if in an error condition. ---------------------- Cat5 ---------------- MM fiber ------- |19th floor Customer | ------> | Cisco 3524 XL| -------------> | SIX | ---------------------- /Fiber ---------------- ------- The password and enable password as well as the SNMP RO community string will be available to the SIX technical staff upon request. This switch is for dedicated use by Fibercloud's customers located on our 19th floor datacenter. At this time five customers (Fibercloud, MetroHiSpeed, Adtaq, Ikano, and RisingNet) will move to this new 19th floor switch. All are currently connected to the SIX via our 18th floor public switch. 24x7 contact for Fibercloud is at 206-777-9988x1 and ask for on call tech in Seattle or email support _at_ fibercloud.com if the problem is non-critical. Thanks, Ed Seiler Fibercloud, Inc. 425-443-4642